Agree deliverables, exclusions, assumptions, and fees.
03 / Develop
Build the agreed product with review points.
04 / Review
Explain findings, limitations, and revisions.
05 / Close out
Deliver final materials and confirm next steps.
02 / Perspectives
Insights from the Field
Getting the operational fundamentals right.
Practical perspectives on the gap between introducing a capability and making it work—through airspace planning, coordination, training, and sustainment.
PLAN / COORDINATE / EXECUTE
Execution & Ground Truth
Airspace Is More Than a Control Measure
A clear overlay is only the beginning. Explore the responsibilities, coordination points, and fallback decisions that connect an airspace plan to execution.
CAPABILITY / PEOPLE / SUPPORT
Capability Integration
Demonstration Is Not Integration
A successful demonstration answers a narrow question. Explore what still needs to be understood about people, procedures, coordination, and sustainment.
CIVIL / SHARED / MILITARY
Civil-Military Integration
Shared Airspace Starts with Shared Understanding
Different organizations bring different responsibilities to the same airspace. Start with shared assumptions, understandable requests, and clear coordination.
DEMAND / SUPPLY / ENDURANCE
Operational Sustainment
Before We Add Another System, How Will We Power It?
Power belongs in the planning conversation—not at the end of it. Ask how loads, charging, fuel, maintenance, and backup affect the operating concept.
CONTROL / COORDINATE / PLAN
Workforce Development
From ATC to Airspace: Bridging the Planning Gap
Build on control experience while expanding the planning picture. Connect airspace users, coordination responsibilities, timing, and decision-making.
REQUIREMENTS / LAYERS / DECISIONS
Doctrinal Architecture
Why I Developed TALAS: The Problem Before the Framework
Begin with the planning problem, not the acronym. Explore the questions behind TALAS without treating a conceptual framework as validated doctrine.
03 / Framework Spotlight
TALAS
Tactical Airspace Layering and Allocation System
An author-developed framework proposed by Giac T. Ly for examining how airspace can be organized and allocated around operational requirements.
Presented as a concept—not adopted doctrine, independently validated performance, regulatory acceptance, or operational approval.
Discussion outline—not a TALAS technical specification.
Define the operating problemUsers, activities, constraints, and assumptions.
Examine allocation optionsCompeting requirements and coordination dependencies.
Identify decisions and limitsResponsibilities, unresolved questions, and validation needs.
Experience & Perspective
GTL.
Giac T. Ly
Founder / Airspace Oracle
The Warpig spirit.
Practical thinking. Direct communication. No slack in the stack.
04 / About
Experience & Perspective
Connecting operational requirements with practical airspace planning.
My perspective comes from military aviation, air traffic control, and operational airspace management, including service as Aviation Division Chief at the National Training Center, Fort Irwin; participation in Project Convergence; and years of civil-military airspace integration in Korea.
My work focuses on connecting operational requirements with practical airspace planning, coordination, and training. My interests include preparing airspace personnel for responsibilities beyond the control facility, integrating emerging capabilities, and examining the foundational requirements that make technology usable in the field.
My career experience includes work with Anduril beginning with Project Convergence at Fort Irwin/NTC, and experimental capability projects in Korea involving the Future Capabilities Directorate and T2COM. Current-project details and nonpublic technical information are intentionally excluded.
Aviation Division Chief, National Training Center (NTC), Fort Irwin
Host-Nation Civil-Military Airspace Coordination & Integration in Korea
Advanced Air Traffic Control (15Q) & Warrant Officer Airspace Leadership
Developed TALAS; wrote on power-generation and sustainment issues.
Built training bridging 15Q air traffic control experience and intermediate airspace skills.
The story behind the Oracle
Born in Saigon, Giac left Vietnam by boat in 1988 (MC138) and resettled in the United States in 1990. He joined the Army in 1995, serving as an 82nd Airborne paratrooper and combat engineer before transitioning to air traffic control and warrant officer service. His journey informs a practical, service-oriented approach to complex challenges.
University Outreach
Guest instruction and community outreach with Hanseo University, including a lecture comparing civil and military airspace systems.
Media coverage of the founder’s educational outreach at Hanseo University. This reference does not imply university or publisher endorsement of Airspace Oracle.
05 / Project Brief
Build a clear project brief.
Organize a non-sensitive project summary, review the briefing preview, and prepare an inquiry. This browser-based workspace does not submit information or create an agreed scope.
0 / 6Core briefing fields completed
Project inputs
Use a fictional or high-level summary. Do not enter classified, controlled, export-controlled, proprietary, or personal-sensitive information.
Live briefing preview
Counts reflect completed fields—not feasibility, safety, or approval.
Scope, fees, availability, and information handling require separate agreement. No automated quote or approval is generated.
06 / Before We Begin
Before we begin
Clear expectations from the first conversation.
Start with the question you need answered and the product your team needs to use.
Can you secure an airspace approval?
No approval is promised. Advisory work can organize requirements and coordination questions; decisions remain with the relevant authorities.
How are projects priced?
A written proposal defines deliverables, exclusions, schedule, review points, and fees before work starts.
Can you provide a seminar or guest lecture?
Describe the audience, subject, format, and timing. Availability and suitability are confirmed before scheduling.
May I send sensitive project material?
Not through this website or ordinary inquiry email. Begin with a non-sensitive summary and agree any additional arrangements separately.
07 / Contact
What decision does your team need to make?
Share the challenge, intended audience, and desired outcome. A short, non-sensitive summary is enough to begin.
Do not submit classified, controlled, export-controlled, proprietary, or otherwise sensitive information.
Private engagements are subject to applicable ethics requirements, any required approvals, availability, and a separate written agreement. Do not submit nonpublic government information or confidential third-party material.
An inquiry does not establish a consulting relationship or guarantee availability.